At Fort Myers Concrete Solutions, we set the forms, tie the footing rebar, place the concrete and finish it, so you know what's under your floor. The site visit ends with a written quote, and part of that is a straight answer on whether you need new foundation work at all.
When does a building site need a full foundation pour?
You need new foundation work when you're putting up a new structure or when an old base has shifted past repair. New structural walls need their own footing to carry the weight of the roof and framing into the ground.
If your existing slab is level and intact, and you only want light, non-load-bearing use out of it, you can leave it alone. A real addition is different, because it needs its own poured footing and stem wall.
Flooding history changes the starting point. Hurricane Ian brought storm-surge flooding to parts of Fort Myers, so before any foundation or slab work we check the property's flood-zone status and elevation. Those two answers set how the job is planned, and we want them in hand before the forms go in.
Closely related: concrete resurfacing. Want a concrete contractor in Fort Myers? Our main page lists everything.
More answers: What Happens During Concrete Work: The Steps Explained · Comparing Concrete Work Quotes: What Is Worth Checking
What drives the cost of stem-wall foundation installation?
Stem-wall foundation installation runs $5.50 to $16 per square foot. The spread comes from what's built beneath the visible concrete.
The compacted gravel subbase is one driver. A thicker base means more material and more machine time. The footing rebar is another, since the more steel the footings and walls call for, the higher the price climbs. A plain footprint with a light steel schedule prices near the bottom of that range, while a large or heavily reinforced one moves toward the top.
Ask on the first call and we'll give you a typical range; the exact figure waits until we've walked the site. No forms go in until the quote is in your hands in writing. Footing layout, rebar, concrete and subbase prep each get their own line.

How do we place and finish a foundation?
We set the forms to your plans and install the footing rebar. Then we place the concrete within the forms and strike it off to the required grade with a screed. Right after screeding, we bull-float the surface.
Once the concrete is placed, we cure it. Next we backfill the space left around the finished foundation, where the job requires it. The last step is grading the ground so it slopes away from the house, which keeps rain from standing against your stem wall.
So we plan exterior pours around wet-season conditions and set your start date with that in mind.
What happens when you call about a site visit?
Call us and we'll ask about your project, the footprint of the planned build, and whether you already have elevation details or drawings. Rough answers are fine, and the drawings and elevation figures can come later.
A visit follows, where we walk the site, check how the ground slopes and measure the boundaries. Materials, mixes and dates stay open on that call. We take our notes and measurements, work out the subbase and steel the job needs, and send a written quote with the line items.
If you have questions about grading or scheduling around the rainy season, we'll answer them, and we lock in a start date when you tell us you're ready. To get started, call Fort Myers Concrete Solutions and set up the site visit.
Pricing Ranges
The figures here give you a sense of scale, and we put the exact price in writing before any work starts.
$0.90–$3.50 per square foot
$5.50–$12.50 per square foot
$3.50–$16 per square foot
You Might Also Need
Questions Welcome
Calling is the simplest way to start, and it costs nothing to ask.
Estimates · No-pressure scheduling